Main Article Content

Abstract

The spare part inventory is an important section that must be managed and controlled in the company, primarily because this section supports the provision of spare parts for the manufacturing process.  An excellent spare part inventory management system matches the records in the SAP system in the warehouse and the actual physical evidence.  The problem faced by the consumer goods company was the difference between recording in the SAP system and the physical evidence for non-consumable goods.  By implementing improvements to the spare part management system for receiving and picking up goods in the warehouse, data discrepancies can be eliminated on non-consumable spare parts consisting of refurbished and new spare parts.  The improvement was implementing the transit area and the 5S practices in the activities conducted in the spare part warehouse.  The transit area is intended for comprehensive checking between warehouse personnel and other department involved with the goods stored or picked up.  Refurbished and new items are more organized, making it easier to place and pick up items.

Keywords

5s practices spare part inventory management system

Article Details

References

  1. Al Amin, M., Roy, S., Rahman, A., & Shikdar, M.I. 2019. Implementation of 5S in Jute Mill: A case study, 10(1), 77-84.
  2. Gergova, I. 2010. Warehouse improvement with Lean 5S – A case study of Ulstein Verft AS. Master’s Degree Thesis. Log950 Logistics.
  3. Gupta, S., & Jain, S.K., 2014. The 5S and kaizen concept for overall improvement of the organization: a case study. Int. J. Lean Enterprise Research, 1(1), 22-40.
  4. Randhawa, J.S., & Ahuja, I.S. 2017. 5s - a quality improvement tool for sustainable performance: literature review and directions. International Journal of Quality & Reliability Management, 34(3).
  5. Riskianto, W.F., Vanany, I., & Arvitrida, N.I. 2020. IPTEK Journal of Proceedings Series No. (7), ISSN (2354-6026) The 2nd International Conference on Global Development - ICODEV December 5th, 2020, Online Conference
  6. Saikh, S. Alam, A.N., Ahmed, K.N., Ishtiyak, S., & Hasan, S. Z. 2015. Review of 5S Technique. International Journal of Science, Engineering and Tecfhnology Research (IJSETR), 4(4), 927-931.
  7. Shinde, D.B., & Shende, P.N. 2014. Improvement of plant layout by using 5A technique – An industrial case study. International Journal of Modern Engineering Research (IJMER), 4(2), 141-146.
  8. Singh, J., Rastogi, V., & Sharma, R. 2014. Implementation of 5S Practices: A review. Uncertain Supply Chain Management, 2, 155-162.