Workers play a crucial role in a company, and their workload significantly influences productivity. This research was conducted in a manufacturing company, specifically in the Warehouse Department (storage section), due to indications of low productivity. The research objective was to analyze the workload profiles of workers in the storage section of the manufacturing company’s warehouse. The analysis was conducted using the Westinghouse method, which considers skill, effort, condition, and consistency in analyzing work time. Cycle time to standard time was calculated considering rating factors and allowances. The research results revealed that the four workers in this section experienced workload levels of 68% for Worker 1, 28% for Worker 2, 57% for Worker 3, and 50% for Worker 4. Overall, the workers exhibited an underloaded workload profile. The highest underload was observed in Worker 2, indicating the lowest productivity among the four workers. Based on these findings, it is recommended to enrich the job tasks for workers in the warehouse or consider transferring them to other departments that require additional workforce to improve the current work system in the warehouse.


Keywords: load profile; warehouse; Westinghouse; workload; work system

Keywords

load profile; warehouse; Westinghouse; workload; work system

Article Details

References

  1. Budaya, P.W., & Muhsin, A. (2018). Workload analysis in Quality Control Department. Jurnal OPSI, 11(2).
  2. Cevikcan, E., Kilic, H.S., & Zaim, S., (2012). Westinghouse Method Oriented Fuzzy Rule Based Tempo Rating Approach. Proceeding of the 2012 International Conference on Industrial Engineering and Operation Management Istanbul, Turkey, July 3-6, 2012.
  3. D’antonio, G., & Chiabert, P. (2018). How to manage people underutilization in an industry 4.0 environment? 15th IFIP International Conference on Product Lifecycle Management (PLM), Turin, Italy, pp.455-464.
  4. De la Riva, J., Garcia, A.I., Reyes, R.M., & Woocay, A. (2015). Methodology to determine time allowance by work sampling using heart rate. Procedia Manufacturing 3 (2015), 6490-6497.
  5. Hanjani, A.R., & Singgih, M.L. (2019). Workload analysis at Biro Human Capital to increase productivity. IPTEK Journal of Proceedings Series No. 5, 404-415.
  6. Lukodono, R.P., & Ulfa, S.K. (2018). Determination of standard time in packaging processing using stopwatcj time study to find output standard. Journal of Engineering and Management Industrial System, 5(2), 87-94.
  7. Nwinyokpugi, P.N. (2018).Workload management strategies and employees efficiency in the Nigerian banking sector. International Journal of Innovative Research & Development, 7(1), 286-293. DOI No. : 10.24940/ijird/2018/v7/i1/JAN18054.
  8. Sari, R.M., Tarigan, U., Rizkya, I, & Elvira. (2019). Workload of workforce in fertilizing industry: An analysis. IOP Conf. Series: Materials Science and Engineering 648 (2019) 012019. doi:10.1088/1757-899X/648/1/012019.
  9. Shishira, S.R., Kandasamy, A., & Chandrasekaran, K. (2017). Workload characterization: survey of current approaches and research challenges. Preceedings of the 7th International Conference on Computer and Communication Technology. https://doi.org/10.1145/3154979.3155003.
  10. Wahyuni, D., Budiman, I., Sembiring, M.T., Sitorus, E., & Nasution, H. (2018). Workload analysis in welding workshop. IOP Conf. Series: Earth and Environmental Sciences 126 (2018) 012095. doi:10.1088/1755-1315/126/1/012095.