“PERBAIKAN PROSES PERAKITAN CASE ASSEMBLY FRONT WITH WATER PUMP AND OIL PUMP PADA PERUSAHAAN AUTOMOTIVE DI KARAWANG” (2020) Industry Xplore, 5(1), pp. 1–7. doi:10.36805/teknikindustri.v5i1.903.