PERBAIKAN PROSES PERAKITAN CASE ASSEMBLY FRONT WITH WATER PUMP AND OIL PUMP PADA PERUSAHAAN AUTOMOTIVE DI KARAWANG. (2020). Industry Xplore, 5(1), 1-7. https://doi.org/10.36805/teknikindustri.v5i1.903