PENJADWALAN PERAWATAN MESIN PRESSURE JET INCINERATOR DENGAN METODE RCM BERDASAR DOWNTIME ANALYSIS DAN FMEA . (2024). Industry Xplore, 9(2), 456-464. https://doi.org/10.36805/teknikindustri.v9i2.7913