1.
PENJADWALAN PERAWATAN MESIN PRESSURE JET INCINERATOR DENGAN METODE RCM BERDASAR DOWNTIME ANALYSIS DAN FMEA . teknikindustri. 2024;9(2):456-464. doi:10.36805/teknikindustri.v9i2.7913