[1]
2025. LEAN MANUFACTURING ANALYSIS IN THE PRODUCTION PROCESS OF MAKING PAVING BLOCKS AT PT XYZ. Industry Xplore. 10, 1 (Mar. 2025), 499–507. DOI:https://doi.org/10.36805/teknikindustri.v10i1.9926.