Main Article Content

Abstract

During 2013 PT. CWI as a solid waste processing services company did not reach its waste processing capacity target due to 62 pressure jet incinerator engine component failures, resulting in high downtime, namely 880 hours or an average of 73.33 hours per month. This repeated failure is due to the equipment maintenance system which is still carried out correctively. This research aims to create a preventive maintenance schedule to improve the maintenance system which has been carried out using the Reliability Centered Maintenance (RCM) method based on downtime analysis using the Failure Mode and Effect Analysis (FMEA) method approach. Based on downtime analysis, it is known that the average Operational Availability value for pressure jet incinerator machines is 87.21%, still below the word class standard of 90%.  From the FMEA analysis, it was found that the component that was most critical and most at risk as a cause of failure was the Refractory Body with an RPN of 240, far above the RPN threshold of 88.6. Other components that are dominant as causes of failure are the Burner, Electric Motor, and Wet Scrubber. With the RCM method, preventive maintenance scheduling can be proposed in the form of a preventive maintenance job schedule in order to improve the corrective maintenance system into a preventive maintenance system.

Keywords

RCM; Downtime; FMEA; Scheduling; Maintenance

Article Details

References

  1. Arsyad, A., & Iskandar, I. (2022). Perencanaan Perawatan Mesin Produksi Roller Mill Unit 1 Tuban Dengan Metode Reliability Centered Maintenance (RCM) di PT. Semen Indonesia (Persero) Tbk. JTM Jurnal Teknik Mesin Unesa, 10(2), 129-132
  2. Ben, J.S. (2022). Implementation of Autonomous Maintenance and its Effect on MTBF, MTTR, and Reliability of a Critical Machine in a Beer Processing Plant. International Journal of Progressive Sciences And Technologies (IJPSAT), 13(1), 57-66
  3. Fatma, N.F., Ponda, H. & Kuswara, R.A. (2020). Analisis Preventive Maintenance Dengan Metode Menghitung Mean Time Between Failure (MTBF) Dan Mean Time To Repair (MTTR) (Studi Kasus PT. Gajah Tunggal Tbk). Jurnal HEURISTIC, 17(2), 87-94.
  4. Firmansyah, M.A., & Nurhalim. (2020). Analisis Reliability Centered Maintenance (RCM) Pada Mesin Hydraulic Press Plate Macjone 1000 Ton (Studi Kasus PT. X). J-Protection: Jurnal Kajian Ilmiah dan Teknologi Teknik Mesin, 4(2), 19-23
  5. Kusuma, T.Y.T., Santoso, A.F., & Muzaeni, A. (2019). Analisis Pemeliharaan KSB WKTB Pump Pada Well Pad 28 di PT. Geo Dipa Energi (Persero) Unit I Dieng Dengan Menggunakan Overall Equipment Effectiveness (OEE) dan Reliability Centered Maintenance (RCM). Jurnal Industry Xplore, 4(1), 58-71
  6. Nugroho, R.D., eat all. (2022). Metode Reliability Centered Maintenance Untuk Keandalan Perawatan Ketel Uap Pada PT. “X”. Jurnal Teknologi,16(1), 35-38.
  7. Ramdani, M., & Khaerudin, D. (2021). Perencanaan Penjadwalan Pemeliharaan Motor Listrik Tatung T60L Nomor 3 Menggunakan Metode Reliability Centered Maintenance Di PT. Luhai Indonesia – Cikande. Jurnal Taguchi, 1(2), 170-186.
  8. Soepardi, S., & Chaeron, M. (2019). Sistem Pemeliharaan Pada Sistem Manufaktur Konsep Sistem Pemeliharaan. Edisi pertama. Yogyakarta: LPPM UPNVY Press