Main Article Content

Abstract

In this research, there is a problem about hikitori cycle process through the use of line balancing method, which is able to reduce long loading times become faster. The main objective of this research is to reduce hikitori loading time by using line of balancing, which will later produce new planning with more efficient process. The term hikitori is not common for all industries, but Japanese companies often use naming standards and work culture input in the industry. One of the industries originating from Japan is hikitori, namely vehicles that transport goods that will or have been processed. So that,  going through the line balancing stage process makes the hikitori productivity system easier, which happens due to the preparation of the hikitori line with the addition of a new production line with a cycle time of 30 minutes, and the graphic visualization shows the problem where the waiting time becomes 89.5 minutes of the total MP, causing the total actual sigma CT is 323 minutes for a total of 10 MP. The research results show that there is a reduction in job balancing, thereby reducing time to 9  MP and waiting time also decreases to 9 MP or 22 minutes.

Keywords

Loading Time; Hikitori; Kaizen; Line of Balancing

Article Details

References

  1. Herdiani, L., & Nurcahyo, R. S. (2018). Line Balancing untuk Tercapainya Efisiensi Kerja Optimal pada Stasiun Kerja. TIARSIE, 15, 1–5.
  2. Mohamad, A. H. (2018). Peningkatan Produktivitas dengan Menggunakan Metode Line Balancing dan Pendekatan Sistem Produksi Toyota pada Proses Produksi Fly Wheel 3 PT. Inti Ganda Perdana. In New England Journal of Medicine (Vol. 372, Issue 2). Universitas Islam Indonesia.
  3. Panudju, A. T., Panulisan, B. S., & Fajriati, E. (2018). Analisis Penerapan Konsep Penyeimbangan Lini (Line Balancing) dengan Metode Ranked Position Weight (RPW) pada Sistem Produksi Penyamakan Kulit di PT. Tong. 5(2).
  4. Prabowo, H. A., & Agustiani, M. (2018). Evaluasi Penerapan Total Productive Maintenance (TPM) Melalui Pendekatan Overall Equipment Effectiveness (OEE) untuk Meningkatkan Kinerja Mesin High Speed Wrapping di PT. TES. PASTI, XII (1), 50–62.
  5. Purba, M., Arifin, Z., Batu, J., & Riau, K. (2020). Evaluasi Kelayakan Material pada Mesin Daichi Proses Cleaning untuk Meminimumkan Downtime dengan Metode Overall Equipment Effectiveness (OEE) di PT. ABC Batam. Staf Pengajar Program Studi Teknik Industri , Universitas Riau Kepulauan Batam PT ABC Batam y. Profisiensi, 8(2), 197–205.
  6. Yansah, A. J. (2016). Analisa Line Balancing Terhadap Proses Produksi Produk Soft Dengan Menggunakan Metode Yamazumi di Pabrik Cold Rolling Mill (CRM) (Studi Kasus PT.X). Tugas Akhir, 1–64.