Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).

Keywords

CPM Information System Incremental

Article Details

How to Cite
[1]
H. Tohari, A. Kudhori, and H. Pandowo, “The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model”, bit-cs, vol. 4, no. 1, pp. 19-23, Jan. 2023.

References

  1. Nugraha, Arif Rakhmat. Evaluasi Pelaksanaan Proyek dengan Metode CPM dan PERT (Studi Kasus Pembangunan Terminal Binuang Baru Kec. Binuang). Tugas Akhir, Program Studi Teknik Industri, Fakultas Teknologi Industri Universitas Islam, Yogyakarta. 2016.
  2. Nishi Sharma. Applications of critical path method in project management. International Journal of Management and Economics. Vol.1.No.26. 2018.
  3. Budi, D.S., dkk. Analisis pemilihan penerapan proyek metodologi pengembangan rekayasa perangkat lunak. TEKNIKA. Vol. 5, No.1. 2016.
  4. Arsia, R., Azdy A.R. Implementasi incremental model pada sistem informasi penyewaan barang dan jasa PT. Sriwijaya Indah Persada Palembang. Teknik Informatika STMIK PalComTech Palembang. Vol.6, No.2. pp. 1-9, 2016.
  5. Pressman, Roger S. Rekayasa Perangkat Lunak. Yogyakarta: Andi. 2010.
  6. Syarif. M., Nugraha. W. Metode incrmental dalam membangun aplikasi identifikasi gaya belajar untuk meningkatkan hasil belajar siswa. Jusikom:Jurnal Sistem Komputer Musirawas. Vol.4. No.1. pp. 43-50. 2019.
  7. Rather. M.A., Bhatnagar. V.A. Comparative study of software development life cycle models. International Journal of Application or Innovation in Engineering & Management. Vol. 4. No.10. p. 7. 2015.
  8. Sutabri, Tata. Analisis Sistem Informasi. Yogyakarta: Andi. 2012.
  9. O'Brien, James. A. Introduction to Information Systems. New York: McGraw-Hill. 2005.
  10. McLeod Raymond, Jr. Sistem Informasi Manajemen. Ed.10. Jakarta: Salemba Empat. 2008.
  11. Husein, Abrar. Manajemen Proyek , perencanaan, penjadwalan & pengendalian proyek. Yogyakarta : Andi Offset. 2008.
  12. Ervianto, I.W. Manajemen Proyek Konstruksi Edisi Revisi. Yogyakarta: Andi. 2005.
  13. Prastya S.E., Saputra, M.C., Pramono D. Pengembangan sistem informasi data pasien seksi rehabilitasi BNN Kota Malang menggunakan metode iterative incremental. Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer. Vol. 2. No.12. pp. 6587-6596. 2018.